Govt. Empanelled Class-1 (Super) EPC Contractor
IST: --:--:--
Corporate Portal
EDL Logo
EDL INFRASTRUCTUREGovt. EPC
PUBLIC WORKS & NATION BUILDING DIVISION
REAL-TIME NODAL TELEMETRY & AUDIT GATEWAY

Public Works Telemetry & Milestone Tracker

An auditable, transparent monitoring interface for Ministry Nodal Officers, Project Management Consultants (PMC), and Government Quality Monitors to verify physical milestones, RFI clearances, and concrete batch telemetry in real time.

Monitoring Active Contract

Brahmaputra Marine Expressway Bridge (Package I)

Physical Progress78.4%Target: 76.0% (Ahead)
Financial Billing74.2%₹ 1,573 Cr Disbursed
RFIs Cleared1,482 / 1,49099.4% Pass Rate
Site Safe Hours3.85MZero LTI Recorded

Key Sub-Structure & Superstructure Milestones

Milestone Stage 4 of 5
Deep Caisson Well Foundations (45m Depth)45 of 45 Sunk (100%)
Pier Shafts & Pier Caps (M60 Grade)42 of 45 Completed (93.3%)
Extradosed Superstructure Spans Erection12 of 16 Spans (75.0%)
Stay Cable Tensioning & Wax Injection48 of 80 Cables (60.0%)

Recent 28-Day Concrete Cube Compressive Strength Log (NABL Verified)

Sample IDStructure ElementSpecified Grade28-Day StrengthStatus
EDL-CUBE-8921Pier P-14 Pier Cap (Pour 2)M70 SCC76.8 MPaPASSED
EDL-CUBE-8920Well Cap W-08 (Mass Concrete)M60 GGBS66.2 MPaPASSED
EDL-CUBE-8919Segment S-11 Cantilever DeckM70 SCC78.1 MPaPASSED
Drone Survey FeedCycle #42
Drone Survey Aerial
Geo-Tagged LiDAR Verified
Flight Date:24 Aug 2026
Coordinates:26.1844° N, 91.7458° E
Elevation Deviation:± 2.5mm (Within Spec)

Authority Engineer Joint Clearances

Monthly Stage Billing #18Verified by PMC Lead
APPROVED
Quality Surveillance Audit Q2Independent Nodal Team
COMPLIANT
Environmental & Forest NOCMoEFCC Surveillance
VALID