Public Works Telemetry & Milestone Tracker
An auditable, transparent monitoring interface for Ministry Nodal Officers, Project Management Consultants (PMC), and Government Quality Monitors to verify physical milestones, RFI clearances, and concrete batch telemetry in real time.
Monitoring Active Contract
Brahmaputra Marine Expressway Bridge (Package I)
Physical Progress78.4%Target: 76.0% (Ahead)
Financial Billing74.2%₹ 1,573 Cr Disbursed
RFIs Cleared1,482 / 1,49099.4% Pass Rate
Site Safe Hours3.85MZero LTI Recorded
Key Sub-Structure & Superstructure Milestones
Milestone Stage 4 of 5Deep Caisson Well Foundations (45m Depth)45 of 45 Sunk (100%)
Pier Shafts & Pier Caps (M60 Grade)42 of 45 Completed (93.3%)
Extradosed Superstructure Spans Erection12 of 16 Spans (75.0%)
Stay Cable Tensioning & Wax Injection48 of 80 Cables (60.0%)
Recent 28-Day Concrete Cube Compressive Strength Log (NABL Verified)
| Sample ID | Structure Element | Specified Grade | 28-Day Strength | Status |
|---|---|---|---|---|
| EDL-CUBE-8921 | Pier P-14 Pier Cap (Pour 2) | M70 SCC | 76.8 MPa | PASSED |
| EDL-CUBE-8920 | Well Cap W-08 (Mass Concrete) | M60 GGBS | 66.2 MPa | PASSED |
| EDL-CUBE-8919 | Segment S-11 Cantilever Deck | M70 SCC | 78.1 MPa | PASSED |
Drone Survey FeedCycle #42

Geo-Tagged LiDAR Verified
Flight Date:24 Aug 2026
Coordinates:26.1844° N, 91.7458° E
Elevation Deviation:± 2.5mm (Within Spec)
Authority Engineer Joint Clearances
Monthly Stage Billing #18Verified by PMC Lead
APPROVEDQuality Surveillance Audit Q2Independent Nodal Team
COMPLIANTEnvironmental & Forest NOCMoEFCC Surveillance
VALID