GOVERNMENT STATUTORY & QUALITY ASSURANCE PROTOCOL

Statutory Compliance, Quality & Vigilance Charter

An uncompromising governance framework adhering to Central Vigilance Commission (CVC) integrity mandates, NABL-accredited metallurgical & concrete testing regimes, and ISO-certified EPC management systems.

Central Vigilance Integrity

Adherent to CVC guidelines for public sector procurement, transparent escrow tracking, and strict anti-corruption safeguards on all state contracts.

✓ Annual Integrity Audit Compliance

NABL Testing Surveillance

100% on-site laboratory testing + mandatory third-party independent testing (IITs / NITs / CRRI) for core concrete, structural steel, and bitumen.

✓ ISO/IEC 17025 Test Standards

Triple ISO Certification

Fully certified Integrated Management System (IMS) encompassing Quality Management, Environmental Safety, and Occupational Health.

✓ ISO 9001 • 14001 • 45001
Quality Control Engineering

7-Tier Quality Surveillance Regime

From quarry source inspections to digital sensor maturity monitoring, every cubic meter of public infrastructure undergoes multi-stage verification.

STAGE 01

Raw Material Validation

Chemical and physical analysis of cement, aggregates, Fly Ash/GGBS, and admixtures before silo batching.

STAGE 02

Batching Plant Telemetry

Automated moisture compensation sensors and SCADA printouts for every transit mixer batch load.

STAGE 03

Pre-Pour Rebar Clearance

Cover block depth gauge inspections, ultrasonic weld flaw tests, and joint sign-off with Authority Engineers.

STAGE 04

Slump & Flow Rheology

Slump cone & flow table tests per IS 1199 at the exact point of placement to guarantee workability.

STAGE 05

Temperature & Hydration

Embedded thermocouples in mass concrete rafts (Bridges/Foundations) to avoid thermal cracking.

STAGE 06

7, 14 & 28-Day Curing Crushing

Cube crushing on digital UTM machines with automatic video capture and encrypted results logging.

STAGE 07

Non-Destructive Testing (NDT)

Ultrasonic Pulse Velocity (UPV), Rebound Hammer, and Core extraction validation by independent labs.

AUTHORITY SIGN-OFF

RFI & QAP Digital Logs

100% Request for Inspection (RFI) records shared directly with Ministry Project Management Consultants.

Public Sector Ethics & Transparency

Central Vigilance Commission (CVC) & RTI Compliance

EDL Construction enforces zero-tolerance towards corruption, unethical procurement, or statutory bypasses. All public project accounts are subjected to concurrent audits and accessible to nodal officers.

Independent Whistleblower & Vigilance Redressal Mechanism

Any stakeholder, citizen, or government official can register a confidential inquiry or report non-compliance directly to the Chief Vigilance Officer.

Email: vigilance@edlconstructionpvtltd.inDirect Desk: +91 (022) 6199 4010

Key Statutory Disclosures

Corporate Identity (CIN):U45200MH2026PTC...
GeM Registration ID:GEM-EDL-IN-2026
GSTIN Registration:27AAACE1234F1Z8
PF / ESIC Code:MH/BAN/0098421
ISO Certification Body:TUV / Bureau Veritas